LOCAL FABRIC
1-3 Days for locally manufactured Nylon and Polyesters etc.

TAIWAN FABRIC LEAD TIMES
30 days needed to weave fabrics not in stock.
14 days to dye fabrics.
7 days required for all Lab Dips.
30+ days to source or manufacture 'special' fabrics.
10-14 days required for arrival of material at GE China.
*Lead times are based on 800 yards minimum.
*To avoid any delays, please include Pantone#. Any swatch should be at least 3x3 inches.

INJECTION MOLDING
1-3 days required to calculate mold charge upon receipt of specifications.
14-25 days are needed to make a mold.
2-5 days required for minor revisions Please specify material requirements.

3-D PICTURE RENDERING (CAD)
This service is currently outsourced and usually costs $100USD per file depending on the complexity of design.

EVA THERMOFORMING (Compression molding)
5-7 days to prepare mold.
Cost is calculated according to size $100-600USD.

ZIPPER PULLS
7 days needed to make mold.
Mold charge average is approximately $2000 HKD.

EMBROIDERY
1-3 days needed upon receiving confirmation of GE sample
Please make sure the logo size is sufficient for Embroidery and avoid small lettering.
Please include detailed Art work, dimensions and precise placement (actual size if possible).

SILK SCREEN
2-4 days needed to screen an average size logo (7 days for larger prints).
Please include detailed artwork, dimensions and precise placement.

RUBBER LOGOS
2-5 days for mold (4 days for PVC)
Include detailed Art work, dimensions, precise placement; location of stitch lines and thread color to be used for logo attachment (indicate grooves).

ACCESORIES
20 days needed for YKK zippers and sliders.
30+ days for accessories from Korea or other countries other than China.
2-10 days for generic zipper pulls.
2-10 days for webbing (logo/special weave) .

 
 
 